BR_Gallery2

Mobile River Bridge Industry Forum

Mobile River Bridge Industry Forum Presentation

On August 28, Mobile River Bridge and Bayway Project hosted nearly 400 construction industry professionals. The Industry Forum served as an opportunity for attendees to learn more about the project and provide feedback to the team. Click here to view the presentation

The Industry Forum presentation is intended to provide an unofficial overview of the project status and studies performed by the project team as of the presentation date. All data and schedules shown in the presentation are preliminary and subject to change. The National Environmental Policy Act (NEPA) review of the preferred project and project alternatives is ongoing and subject to final review and approval by the Federal Highway Administration.

Want to stay connected to the project? Sign up for our list by sending an email to [email protected].

Draft Environmental Impact Statement

Bicycle / Pedestrian Workshop
The Alabama Department of Transportation (ALDOT) hosted a bicycle and pedestrian workshop to solicit input on the location of the bicycle and pedestrian river crossing that will be part of the I-10 Mobile River Bridge and Bayway Widening project. The workshop was held Thursday, Oct. 27, 2016 at the James M. Seals Jr Community Center, 540 Texas Street Mobile, Alabama 36602 from 5 – 8 p.m. All comments that were submitted online and by mail by Friday, Nov. 11, 2016 were collected as project documents.

Bicycle Pedestrian Workshop Presentation

FOR IMMEDIATE RELEASE 1/09/15
Corridor Hearing Report Summary for Proposed I-10 Mobile River Bridge is available for download below.
Please note this document is available as an Adobe Acrobat pdf document. While every effort has been made to keep file size at a minimum, download speeds and times may vary.

FOR IMMEDIATE RELEASE 7/22/14
Draft Environmental Impact Statement Approved for Proposed I-10 Mobile River Bridge is available for download below.
Please note this document is available as an Adobe Acrobat pdf document in five parts as outlined below. While every effort has been made to keep file size at a minimum, download speeds and times may vary.

FOR IMMEDIATE RELEASE 1/14/16
Final Vibration Study for Proposed I-10 Mobile River Bridge is available for download below.
Please note this document is available as an Adobe Acrobat pdf document in five parts as outlined below. While every effort has been made to keep file size at a minimum, download speeds and times may vary.